A specialized multi-jet commercial hydrotherapy and aquatic recovery system engineered for heavy-traffic wellness venues.
Background: Commercial hydrotherapy and sports recovery facility built for Jianlibao Fitness Club in Guangzhou, supporting high-volume daily member usage.
Challenges: Balancing complex multi-jet hydraulic pressures across high-flow massage stations, strict sanitation under heavy peak bather loads, and precise heating.
Solution: Turnkey hydrotherapy engineering integrating 18 sets of 11-jet massage beds, 25 Emaux pumps, 4 commercial sand filters, air-source heating, medium-pressure UV, and automated dosing.
Value: Delivered powerful, ergonomic hydrotherapy massage with flawless hydraulic balance, medical-grade water sanitation, and automated low-maintenance operation under continuous peak loads.
| Project Timeline | 2025 |
| Products We Adopted | Ergonomic hydromassage water beds, circulating filtration system, multi-jet water massage system, automatic sterilization & disinfection system, constant temperature heating system, intelligent electric control system, full set of pipeline and valve fittings. |
| Application Scope | Corporate employee wellness center, indoor commercial hydrotherapy space, enterprise leisure & recuperation area. |
| Services We Provided | On-site site survey, professional hydrotherapy scheme design, full set of equipment supply, standardized machine room equipment installation, whole-system commissioning & testing, operation guidance and complete after-sales technical support documents. |
Project Background & Client Needs
The client, Guangzhou Jianlibao Group, planned to build a professional indoor hydrotherapy massage area for employee wellness and business reception, and required a one-stop full-equipment solution with commercial-grade stable performance. Key needs included:
✔ Professional and comfortable hydromassage experience to meet daily relaxation and physical recuperation demands.
✔ Efficient and stable water treatment system to ensure safe and hygienic water quality under long-term frequent use.
✔ Reliable constant temperature heating system to maintain comfortable water temperature all year round.
✔ Standardized machine room layout for convenient daily operation and maintenance.
✔ Compliance with commercial water facility safety and hygiene management standards.
Challenges & Our Custom Solutions
Key Highlights & Project Outcomes