A turnkey 266㎡ commercial pool retrofitting project integrating IoT compliance monitoring, automated sanitation, and AI robotic cleaning.
Background: Full-scale indoor pool system renovation for Ascott Serviced Apartments in Guangzhou's central business district (CBD).
Challenges: Aging faulty legacy equipment, unstable water conditions, manual chemical dosing errors, and a lack of digital municipal compliance monitoring.
Solution: Turnkey retrofit deploying premium Emaux, AQUA, and FAIRLAND hardware—including 63 pumps, 19 sand filters, heat pumps, UV sterilization, IoT monitors, PLC controls, and AI cleaning robots.
Value: Restored crystal-clear water quality, eliminated chemical dosing errors, and delivered fully automated operation with real-time digital data accessible for government regulatory compliance.
Project Timeline: 2026
Products We Adopted: Full set of pool lifesaving equipment, professional pool cleaning tools, high-efficiency circulating filtration system, hydromassage system, multi-stage sterilization & disinfection system, underwater LED lighting system, constant temperature heating system, intelligent pool control system, full set of machine room pipeline & valve assemblies.
Application Scope: High-end serviced apartment supporting swimming pool, premium business gym constant-temperature pool, Zhujiang New Town commercial fitness & leisure venue.
Services We Provided: Early scheme design & zoning planning, full set of equipment supply, standardized machine room equipment installation & pipeline laying, whole system commissioning & parameter tuning, operation staff training and long-term after-sales technical support.
Project Background & Client Needs
Ascott Guangzhou, located in Zhujiang New Town central business district, planned to upgrade its indoor gym swimming pool to match the high-end serviced apartment positioning and serve business residents and premium fitness members. The client put forward clear requirements on water quality standards, operation efficiency and venue grade. Key needs included:
Challenges & Our Custom Solutions
High-End District Positioning & Service Grade Upgrade
Aiming at the core business district positioning of Zhujiang New Town, we selected commercial-grade high-performance core equipment and optimized the water circulation and lighting scheme. The system works with the natural skylight of the venue to maintain high clarity and bright visual effect of the pool water all year round, which greatly improves the swimming experience and effectively supports the venue to upgrade its service pricing and high-end brand image.
Dual-Zone Water System Matching & Uniform Water Quality
For the pool with separate shallow and deep water zones, we customized a targeted circulation and filtration scheme, adjusted the circulation flow rate and filtration cycle according to the water depth and use frequency of different zones. It ensures uniform and stable water quality across the whole pool, meets the safety use standard of the shallow water area for beginners and the fitness demand of the deep water area, and fully complies with commercial swimming pool operation specifications.
Operation Energy Saving & Maintenance Efficiency Optimization
We adopted high-efficiency energy-saving core equipment matched with an intelligent automatic control system, which realizes automatic operation of filtration, disinfection and constant temperature. Through optimized hydraulic design and energy-saving operation logic, the overall power consumption is reduced by 30% compared with traditional schemes under the same operation effect. It greatly reduces manual operation frequency and daily maintenance labor input, and effectively cuts the long-term operation cost of the venue.
One-Stop Full-Category Delivery & Quality Control
We provide all supporting facilities required for the swimming pool in one stop, from core water treatment systems to lifesaving appliances and cleaning tools. Unified supply and installation ensures the matching compatibility of all systems, avoids multi-party coordination for the owner, and guarantees unified quality standards and stable operation effect of the whole project.
Key Highlights & Project Outcomes
● High-End Landmark Venue in CBD: Located in Zhujiang New Town core area, matching the premium positioning of Ascott serviced apartment, it effectively upgrades the venue grade and service pricing power.
● Scientific Dual-Zone Standard Design: Separate shallow and deep water areas cover users of all swimming levels, conforming to commercial standard pool specifications and meeting diversified fitness demands.
● Remarkable Energy Saving Benefit: The optimized system reduces overall power consumption by 30%, with automatic operation greatly reducing manual maintenance input and significantly lowering long-term operation cost.
● Stable High-Clarity Water Quality: Multi-stage filtration + composite disinfection ensures long-term crystal-clear water quality and stable constant temperature, fully meeting the high-standard service demand of high-end business venues.
● One-Stop Full Service Delivery: Full responsibility from scheme design, equipment supply to installation and commissioning, which saves the owner's management cost and realizes efficient high-standard delivery.
● Standardized Machine Room Construction: The equipment and pipelines are arranged in an orderly manner with clear identification, which is convenient for daily operation management and later maintenance, ensuring long-term stable and reliable operation of the system.